PREY TOLUCA MEXICO
Installation of Narada 10OPzV1000 battery banks and refurbishment of the old installation with anti-seismic bars to prevent possible damage caused by the small temblors produced by the outflow of water.
Colombia Telecomunicaciones ESP S.A. (Movistar)
During the last six years Tempel Colombia Ltda. has signed 9 contracts with Colombia Telecomunicaciones ESP S.A. (Movistar), the scope of which includes the transportation, dismantling, supply and installation of 9871 Battery Banks @ 48Vdc in the related references and capacities.


Changing UPS Powerdare batteries
The scope of this project was the supply and installation of the battery bank for the UPS at the Macarena node, one of the most important for Bogota's stationary operation.