PREY TOLUCA MEXICO

Installation of Narada 10OPzV1000 battery banks and refurbishment of the old installation with anti-seismic bars to prevent possible damage caused by the small temblors produced by the outflow of water.

Colombia Telecomunicaciones ESP S.A. (Movistar)

During the last six years Tempel Colombia Ltda. has signed 9 contracts with Colombia Telecomunicaciones ESP S.A. (Movistar), the scope of which includes the transportation, dismantling, supply and installation of 9871 Battery Banks @ 48Vdc in the related references and capacities.

Changing UPS Powerdare batteries

The scope of this project was the supply and installation of the battery bank for the UPS at the Macarena node, one of the most important for Bogota's stationary operation.

TOLUCA DAM MEXICO
TOLUCA DAM MEXICO

Installation of Narada 10OPzV1000 battery banks and reinforcement of the old installation with anti-seismic bars to prevent possible damage caused by the small tremors produced by the outflow of water.

Colombia Telecomunicaciones ESP S.A. (Movistar)
Colombia Telecomunicaciones ESP S.A. (Movistar)

Over the last six years, Tempel Colombia Ltda. has awarded Colombia Telecomunicaciones ESP S.A. (Movistar) nine contracts, the scope of which includes the transportation, dismantling, supply and installation of 9871 battery banks @ 48Vdc in the references and capacities listed.

REPLACING UPS POWERDARE BATTERIES
REPLACING UPS POWERDARE BATTERIES

The scope of this project was the supply and installation of the battery bank for the UPS at the la Macarena node, one of the most important for fixed operations in Bogotá.